This Rivers Street project incorporates 2 types of the car parking systems. It was completed in 2019 and has been a house to 20 car parking spaces ever since. 14 spaces in the TrendVario 4300 and 6 spaces in the MultiBase 2072i.
20
PARKING SPACES
2019
DATE INSTALLED